Project status
Completed
Location
Maryborough, QLD
Client
Downer
Start Date
Mar 2019
Completion Date
Nov 2019

This Salix certified designed (RPEQ) 3-way turnout is for Maryborough Service Delivery Center upgrade operated by Downer EDI. Turnout is supplied to size of 1-8, R129, narrow gauge 41kg Rail with Embedded Slab Track. Following are the scope of supply.

  • Supply of materials of All steel works including
    • Switch Sets
    • Frog’ crossings
    • Closure rails
    • Fastenings and turnout bearers to suit embedded track system
    • Mechanical switch system for 3-way turnout
  • Provide a procedure/ sequence for installation
  • Full set of installation drawings
  • Operational and maintenance document
  • Maximise of site assembly for delivery components. Rails are not to be welded (bolted and spliced)
  • Provide assembly support